Logo
صورة المنتج

Major Pharmaceutical Industry Projects in Syria

1. Al-Saad Pharmaceutical Industries – Aleppo (Al-Mansoura)

Complete study, design, and installation of central HVAC systems and air-handling units (AHUs) according to GMP standards. Includes duct fabrication, cold and hot water networks, and automation control systems.

2. Barakat Pharmaceutical Industries – Aleppo (Al-Mansoura)

Full execution of central air conditioning and ventilation systems, AHUs, and air networks designed to meet GMP and WHO standards.

3. Sandi Pharma – Hayan Industrial City

Design and implementation of HVAC systems, air handling units, and advanced duct networks with filtration and air quality control systems.

4. Al-Shahbaa Pharmaceutical Industries – Aleppo (Al-Mansoura)

Turnkey HVAC installation, including AHUs, air ducts, and cold/hot water piping, ensuring temperature and humidity control for production zones.

5. Al-America Pharmaceutical Industries – Damascus (Sabboura)

Design, supply, and installation of complete HVAC systems, duct networks, and air-handling units according to SMACNA and WHO standards.

6. National Company for Pharmaceutical Industries (N.C.P.I.) – Aleppo (Khan Al-Asal)

Installation of air-handling units and duct systems with high-efficiency air filtration and process exhaust systems.

7. Rama Pharma – Aleppo (Al-Zira’a)

Comprehensive HVAC system study and installation meeting WHO requirements, including AHUs and filtration systems for clean areas.

8. Ibn Al-Haytham Pharmaceutical Industries – Aleppo (Al-Mansoura)

Turnkey HVAC and air-filtration system meeting WHO and GMP standards, including AHUs, ducts, and air-handling for sterile zones.

9. MG Pharma – Damascus (Airport Road)

Fabrication and installation of complete duct networks compliant with international standards for ventilation and exhaust systems.

10. Afamia Pharmaceutical Industries – Hama (Abu Qubeis)

Upgrading all HVAC components to meet WHO and GMP conditions, including AHUs and cleanroom filtration systems.

11. Al-Razi Pharmaceutical Industries – Aleppo (Al-Mansoura)

Installation of HVAC and duct systems for sterile and non-sterile sections, meeting WHO requirements for pharmaceutical manufacturing.

12. Al-Mustaqbal Pharmaceutical Industries – Aleppo (Al-Mansoura)

Execution of full HVAC system with AHUs and chilled water systems under WHO supervision.

13. Rida Pharma – Aleppo (Al-Mansoura)

HVAC and ventilation systems for all production zones, ensuring air purity and compliance with GMP guidelines.

14. Al-Shifa Pharma – Aleppo

Complete HVAC, air ducts, and filtration systems for drug production facilities, ensuring compliance with GMP standards.

15. Farma Sir Pharmaceutical Industries – Damascus (Sabboura)

Turnkey HVAC and air-handling system with GMP and WHO compliance, including chilled water and air filtration networks.

16. Al-Salam Pharma – Aleppo (Al-Mansoura)

Installation of full HVAC systems with air ducts, AHUs, and filtration for cleanroom production environments.

17. Al-Amin Pharma – Aleppo (Al-Muhandisin)

Design and installation of duct networks and HVAC systems for sterile zones.

📸 Photos Gallery